Implementation in Warsaw - upgrade patch cable VHP - 2012
Design and construction of the fiber optic line 96J in relation Krakow ul. Jasnogórska 1 - Krakow ul. Śląska 10 about 7 km, at the request of EXATEL SA - June 2012
The scope of work included:
-preparation of the execution project of fiber optic cable construction
-incurring TOTKtsdD Z-96J cable to the existing pipeline cable
-welded-performance 480 pcs
-installation of fiber optic couplers FIST GCO2 3 pcs
-PS 19/24/1 U splices installation and "sewing out" of the cable at both ends - 8 pcs
-reflectometric measurements of fiber optic cable 96 pcs
-optic power measurements 96 pcs
Design and construction of fiber-optic lines in relation 288J Krakow ul. Jasnogórska 1 - Krakow Pl. Matejki 12 about 9 km, and 144J Cable on Jasnogórska street, at the request of EXATEL - June 2012
The scope of work included:
-preparation of the execution project of construction of fiber optic cable
-incurring Z-XOTKtsd 288J cable to the existing pipeline cable
-microcable Z-XOTKtsd 144J installation with 367 meters length
-welded-performance 1440 pcs
-installation of fiber optic couplers FIST GCO2 3 pcs
-PS 19/24/1 U splices installation and "sewing out" of the cable at both ends - 18 pcs
-assembly of 3 distribution cabinets
-reflectometric measurements of fiber optic cable
-optic power measurements
Reconstruction of fiber optic line OTK DT 0811 in Piękna streer in Szydłowiec for the district of Szydłowiec-April 2012
The scope of work included:
-construction of a new pipeline-cable
-assebmly of screw connectors polyethylene pipes
-designation and designation-test columns assembly
-tightness test of second sewer section and pipeline cable